Tag Archives: unworkable closet to workable niche

Update

The closet space has been taped, mudded, primed and painted. The vanity cabinet has been installed where it will go. The limestone top for it has been selected, paid for and is awaiting pick up. The now-obviously necessary drawer and cabinet hardware is under discussion. After that? We have to figure out finishing the sides and the shelves which are going above. We have to find something to fill the flooring gap, temporarily anyway. (The guy who built this house took every short cut he could. One of those was that most of the floor coverings end at the closet doors.

We’ve decided what we’ll probably do with the old closet door (and its frame). More on that later. At the moment, they’re in the living room kitchen,(2/14) NOT where it will stay.

The limestone top is in place. 2/10/18.

The cabinet hardware is on order 3/2018.

Advertisements