Tag Archives: memoir retype

Fallout

I am surprised. I’ve had relatively little fallout/backlash from sending the memoir out to the publisher. Sending it to my writing group was worse. Every time I talk to someone about it or make changes someone sees, yes, it’s a little nutty. But… no screaming awake. No crying jags. No being pissed off and not knowing wtf is wrong.

There’s various pieces of consensus: there are still a few typos. There are some stylistic things I did which every single editor has pointed out. The last half isn’t as well written as the first.

That last didn’t surprise me at all. The first half is what took 10 years to write; it’s the map to my particular Hell. The last half was difficult because I just couldn’t see how to write it so it wasn’t a total bore. There’s a reason “They lived happily ever after.” is one sentence. But I needed to show the unraveling of the PTSD and healing that allowed that to happen. I needed to show that it wasn’t a straight line. I needed to illustrate that the process is not done and never will be.

That all took some doing. I only sort of really knew what book I was writing, what the arc of it really was when I sat down last month and decided to pull it together as I did. For one reason only. It had to be the best, most concise piece I could write and present to my publisher. I finally could look at it with my professional eyes, rather than through the lens of the wounded kid with PTSD.

I have no idea what happened that made that possible, but it was.

J

Advertisements

Chore Status 9/12

It seems as I get things done I’m also adding more. Accordingly, I edit and repost this every Monday so that I start each week with only the still needed list. The old list is available, with the struck-through text, on the last week’s post!

to do list 1

Living Room:

  • Spackle  (as needed) wall board prep is complete, at least for everything but the hall, which we are NOT doing right now.
  • Sand: (as needed)
  • Primer, 2nd coat: (as needed)
  • Caulk/chinking: Remaining: Above/below front window and to the door. Baseboards: street wall. Clean up
  • Final Paint: entire room (street, oak, kitchen, bookcase wall, hall walls (closet, bath, pantry), stair wall, entry, stair interior wall, and stair rail.
  • Cull/clean: get fabric to Jeannie’s for reupholstery. Window replacement on north side (trim removal done).
  • (long term) Replace window interior trim and mod hall door trim to match front door (and get rid of those F’n ledges!!!). Replace baseboards for same reason. Sand and redo floor. Move kitchen door?

In broad terms what remains in the living room prepainting effort:  Between the logs looked awful and was impossible to paint, so we’re caulking between the logs. What needs to be done: window to the door.

We need to finish the additional spackling, patching, between log caulking and other caulking. Then we sand, again. (Being done on a wall by wall basis, as needed) Then we primer, again, as needed on interior walls, exterior walls are getting a full coat of primer. THEN we paint! I thought it was 2 coats of primer the manufacturer recommended. It’s two coats of paint!

Blue stickies on the door (meaning job has been completed): 5 11 12 17 18 19 20

Measure furniture. Make a floor plan so you move the furniture and books ONE more time, not more than that!

Hall: Replace smoke detector (future).

Kitchen: (Cull/clean) Get the 2nd Hoosier into the kitchen.  Dismantle the f’n 30 square foot counter and redo it to something saner!!! (long term) Pull the windows, put in the new wall and windows. Finish the sink window trim.

Laundry: (Cull/clean)  (longterm) Get the switch thing set up so you don’t have to pull the dryer out anymore!

Bathroom: (Cull/Clean) corners, window,  clear out.

Bedroom: (Cull/Clean) get couch downstairs. When reupholstered chair returns, put it here, not living room.

Attic: Get the 1 base cabinet in there (or elsewhere) and the cabinet which came from the storage. Get the bookcases from office 1 into the attic.[1 base cabinet used in kitchen 8/20]

Office 1: . Get the counter cleaned. Remove everything from the bookcases on the north wall and get the cases moved into the attic.  Bring in the new dresser currently in the wood shed.

Office 2: Clear off the blue desk. Sell/cull items awaiting that. (long term) Move the office function downstairs.

Dining Room:  Take down candlabra, sell. Paint china cabinet and relocate the 2 Hoosiers.

Storage: Remove the 2nd Hoosier for the kitchen.Get at least 5 boxes out and deal with the stuff in them. Move to 10 x 20 unit.

Garden: Continue, finish and keep up the weeding, so that the weeds don’t take over the yard and next year’s vegetable garden is a disaster accordingly! [Worked on this 7/24-5, week of 8/20, 8/27, 8/29, 9/11]

Get the windows done. SR door panel 27.5 x 64,

Get the online and computer files cleaned out. (Drafts here = 51 as of 7/27, 50 as of 8/1, 48 8/9, 49 8/22, 48 9/5,  44 9/11 “Tally” page information (tab, on this blog) moved to history 9/17.

Systems, Mostly Long Term: Heating: stack ready for use,  2 cords of wood. Finish basement insulation. Order 2 more cords of wood. Roof: get new back roof. Water: get clips installed both roofs. Get guttering/water barrel. (long term) Landscaping: Walls, fencing, gates, plantings as needed.

Writing:

  • Memoir retype effort: 6% 9.6% 12.5% 15.9% 18% 21.6% 23.9% 27.2%29.5%  36.4% 38.6% 40.9% 43.2% 46.6% 52.2% 56.8% 57.9% complete (I’m amused that I seem to do this in 3% chunks. I’m not counting or anything, it’s just that the sections are short, and it’s difficult emotionally, especially the first 3rd, so I’ve been doing it until I felt like quitting, then I let myself stop.)
  • 3 stories into novel: 05% complete I haven’t worked on this to speak of. Did locate the 2 older story fragments, which is what I’m calling 5%. Worked a little on one of the stories, call it 07% now 9/9
  • kitchen book: nothing new as of 9/5
  • possible future editing jobs: nothing new