Update

The closet space has been taped, mudded, primed and painted. The vanity cabinet has been installed where it will go. The limestone top for it has been selected, paid for and is awaiting pick up. The now-obviously necessary drawer and cabinet hardware is under discussion. After that? We have to figure out finishing the sides and the shelves which are going above. We have to find something to fill the flooring gap, temporarily anyway. (The guy who built this house took every short cut he could. One of those was that most of the floor coverings end at the closet doors.

We’ve decided what we’ll probably do with the old closet door (and its frame). More on that later. At the moment, they’re in the living room kitchen,(2/14) NOT where it will stay.

The limestone top is in place. 2/10/18.

The cabinet hardware is on order 3/2018.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s