Chore Status 9/19

to do list 1

Living Room:

  • Spackle wall board prep is complete, at least for everything but the hall, which we are NOT doing right now.
  • Primer, 2nd coat: (as needed)
  • Caulk/chinking: Remaining: Clean up
  • Trim pieces cut, painted, installed between beams
  • Final Paint: entire room (street, oak, kitchen, bookcase wall, hall walls (closet, bath, pantry), stair wall, entry, stair interior wall, and stair rail.
  • Cull/clean: get fabric to Jeannie’s for reupholstery. Window replacement on north side (trim removal done).
  • (long term) Replace window interior trim and mod hall door trim to match front door (and get rid of those F’n ledges!!!). Replace baseboards for same reason. Sand and redo floor. Move kitchen door?

In broad terms what remains in the living room prepainting effort:  clean up full primer on front wall.

We need to finish the clean up and primering. THEN we paint! I thought it was 2 coats of primer the manufacturer recommended. It’s two coats of paint!

Blue stickies on the door (meaning job has been completed): 20 21

Measure furniture. Make a floor plan so you move the furniture and books ONE more time, not more than that!

Hall: Replace smoke detector (future).

Kitchen: (Cull/clean) Get the 2nd Hoosier into the kitchen.  Dismantle the f’n 30 square foot counter and redo it to something saner!!! (long term) Pull the windows, put in the new wall and windows. Finish the sink window trim.

Laundry: (Cull/clean)  (longterm) Get the switch thing set up so you don’t have to pull the dryer out anymore!

Bathroom: (Cull/Clean) corners, window,  clear out.

Bedroom: (Cull/Clean) get couch downstairs. When reupholstered chair returns, put it here, not living room.

Attic: Get the remaining  base cabinet in there (or elsewhere) and the cabinet which came from the storage [cabinet  in attic 9/22]. Get the bookcases from office 1 into the attic.[1 base cabinet used in kitchen 8/20] Get doors on the cabinet. Decide what from attic to sell: wrought iron tables, wallpaper lamp, other hanging lamps, plate rack, etc.

Office 1: . Get the counter cleaned. Remove everything from the bookcases on the north wall and get the cases moved into the attic.  Bring in the new dresser currently in the wood shed.

Office 2: Clear off the blue desk. Sell/cull items awaiting that. (long term) Move the office function downstairs.

Dining Room:  Take down candlabra, sell. Paint china cabinet and relocate the 2 Hoosiers.

Storage: Remove the 2nd Hoosier for the kitchen.Get at least 5 boxes out and deal with the stuff in them. Move to 10 x 20 unit.

Garden: Continue, finish and keep up the weeding, so that the weeds don’t take over the yard and next year’s vegetable garden is a disaster accordingly! 9/11 was last time this was noted, but I’ve worked on it sporatically since.

Get the windows done. SR door panel 27.5 x 64,

Get the online and computer files cleaned out. (Drafts here = 44 9/11 “Tally” page information (tab, this blog) moved to history 9/17.

Rugs: Almost nothing done.

Writing:

  • Memoir retype effort: 57.9% 61.4% 62.5% complete (I’m amused that I seem to do this in 3% chunks. I’m not counting or anything, it’s just that the sections are short, and it’s difficult emotionally, especially the first 3rd, so I’ve been doing it until I felt like quitting, then I let myself stop.)
  • 3 stories into novel:  Worked a little on one of the stories, call it 07% now 9/9, 9/20
  • kitchen book: nothing new as of 9/5
  • possible future editing jobs: nothing new
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s