Recharge?

Okay, the week has gotten to me. The “it’s never going to be done”paint job is getting to me. My work situation has become more complicated, in the way that my colleague complicates things, again. And I’m weary of the apparently never-ending, never finished overwhelming things which need to be done.

And we added one: our 2nd batch of wood was delivered this a.m. Certainly, it beats freezing this winter, but we hadn’t, because it has been so hot and sticky, dealt with the 1st cord, mostly. Now we have a 2nd to deal with — and we need at least one more, 2 by preference and there will be nowhere to put those until we deal with these.

Re the fridge? We went shopping again yesterday and codified our planning. The tech was here yesterday, talked to KA about the fridge and they’re shipping him a part. (This is identical to what happened with the 1st fridge btw.) Assuming he can recharge the system, then it should work. But whether it will work for 3 days or 3 years is unknown. So. . . our short term plan is to use the small fridge we have, buy another big cooler (just in case) and hope for the best. The midrange plan is that AFTER the new roof goes on, next month, we start saving for a new convertible fridge/freezer. We plug it in as a freezer and sell the smaller commercial freezer. If the fridge continues to work? Great. If not, we convert the dedicated fridge/freezer to a fridge and probably go buy another freezer or maybe another convertible. Dedicated freezers are a lot cheaper than fridges. A convertible fridge/freezer although the insulation and compressor have to be beefed up are basically much simpler than the (fragile?) high-tech fridges. Hopefully this means they’ll work for 10 years at least instead of 4 or 5.

The interior staircase wall I worked on yesterday is gorgeous by comparison to when I started, it is no longer filthy, and marked with various wear.

I have 2 tasks today. 1) Clear the section of the kitchen where we plan to move the fridge. 2) Start moving things away from the other side of that wall, the kitchen wall, so I can clean and spackle it. It’s the only piece of the living room’s walls which haven’t been done!

And of course, there’s laundry and dishes and various horizontal surfaces to clear: kitchen counters and the dining room table being the most urgent. The dishes, laundry, counters and table are the things which almost always need work, sigh.

 

Advertisements

2 responses to “Recharge?

  1. Oh dear! It does sound like you need a day ‘off’ before you hit burn out. Can you schedule in something fun?

  2. We’re going to go and get the final paint today. About 2 hours from here. Nice break, not looking at the living room.

    DH replaced the trim on the other front corner last night and did caulking for it — it looks fantastic.

    I started clearing out the stuff in the way of getting to the last wall, the kitchen wall.

    This morning DH also swapped the refrigerators,so that the small one we’re using is actually IN the kitchen. That will make life much easier!

    More progress, it seems slow, slow, but we’re actually getting things done, one at a time. And, yes, we’re taking a break this morning.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s